Project 3

CURRENT PROJECT IN HAND:

  • Strengthening and Improvement of Road Amlarem to Mukhtapur (10km), in the state of Meghalaya using RBI Grade-81 Technology.
  • Strengthening and Improvement of Road JBRC to Jalaphet (17km), in the state of Meghalaya using RBI Grade-81 Technology.
  • Open Excavation at Switchyard for Turial Hydro Electric Power Project (30 x 2 = 60MW), Mizoram – 95% Completed.
  • Optical Fabre Cable laying works for 167km in 7 point to point Spur Routes in the State of Manipur (Sub Contract).
  • Open Excavation at Spillway and Stilling Basin for Turial Hydro Electric Power Project (30 x 2 = 60MW), Mizoram.
  • Up gradation of 148 bedded hospital to 300 bedded General Hospital at Naharlagun in Arunachal Pradesh – Client HSCC.

WORK SPECIALIZATION:

Well Foundation Work in Sandy , Clay, and Rocky Strata. All Type of shuttering & reinforcement of foundation, sub structure, superstructure work. Making of temporary pile bridge & island with sheet pile with the help of Vibro Hamber.

MAJOR PROJECT COMPLETED:

Strengthening of road from 200TPH Crushing Plant site to Mauchar Quarry @ 14 Km for Turial Hydro Electric Power Project (30 x 2 = 60 MW), Mizoram.

Photo bareilly

Detail :-Bahabul River Bridge Near Bareilly
Under- Era Infra Engineering Pvt. Ltd. Bareilly – Sitapur road project.

2. Photo Doiwala

Detail :-Song River Bridge near doiwala
Under- Era Infra Engineering Ltd (Muzzaffarnagar-Haridwar-Dehradun Road Project.)

3. Photo Roorkee

Detail :-Ganga Canal River Bridge At Mangolore Near Roorkee (U.K.)
Under- Era Infra Engineering Ltd (Muzzaffarnagar-Haridwar-Dehradun Project.)